Use keywords in the search box below to easily find what you're looking for.
This project includes four spaces within the Environmental Sciences Building. Three existing classrooms are being converted into Research Labs and Student Work Rooms. Spaces are original to the building and have not had significant upgrades since they were built. Routing of utilities in this building is exposed and part of the original building design, but systems are at the end of their useful life or at capacity, making new connections very challenging.
The new Research Labs have new fume hoods, sinks, casework, and freestanding, adaptable research benches. The new Student Work Rooms have new finishes and flexible workstations. All existing eye wash stations were upgraded to meet current code.
This project includes four spaces within the Environmental Sciences Building. Three existing classrooms are being converted into Research Labs and Student Work Rooms. Spaces are original to the building and have not had significant upgrades since they were built. Routing of utilities in this building is exposed and part of the original building design, but systems are at the end of their useful life or at capacity, making new connections very challenging.
The new Research Labs have new fume hoods, sinks, casework, and freestanding, adaptable research benches. The new Student Work Rooms have new finishes and flexible workstations. All existing eye wash stations were upgraded to meet current code.
This project includes four spaces within the Environmental Sciences Building. Three existing classrooms are being converted into Research Labs and Student Work Rooms. Spaces are original to the building and have not had significant upgrades since they were built. Routing of utilities in this building is exposed and part of the original building design, but systems are at the end of their useful life or at capacity, making new connections very challenging.
The new Research Labs have new fume hoods, sinks, casework, and freestanding, adaptable research benches. The new Student Work Rooms have new finishes and flexible workstations. All existing eye wash stations were upgraded to meet current code.