This project involves the conversion of an existing barn into an office/study space for a residential client. The owners were interested in pursuing Passive House design criteria in the design, so all of the new construction is detailed to meet PH standards. A heat recovery ventilator was added on the second floor to capture what would be wasted heat from the system and resuse it. Photos are from the project construction phase currently under way.